Home  ›  Guides
Guides

Steel estimating guides

Practical, no-fluff articles on how structural steel and misc metals actually get estimated: the workflows, the benchmarks, and the traps to avoid.

Takeoff

Automatic steel takeoff from PDF drawings

What software can reliably find on structural drawings, what still needs the estimator, and the review workflow that makes automation safe to bid from.

Read the guide →
Workflow

Steel takeoff from Bluebeam: a faster structural workflow

Mark up the drawings, export to CSV, and import a routed takeoff straight into your estimate instead of re-keying it row by row.

Read the guide →
Method

Estimating misc metals: why hours beat tons

Rails, stairs, ladders and embeds are labor-heavy and weight-light. Estimate them by hours per LF, per riser, and per piece, with real benchmark ranges.

Read the guide →
Method

How to estimate structural steel, step by step

Takeoff, connections, shop labor, finish, erection, delivery: the estimator's sequence to a marked-up bid you can defend line by line.

Read the guide →
Reference

Structural steel estimating benchmarks (hrs/ton & $/ton)

Fabrication and erection ranges by complexity: the sanity-check bands to test your bid against before you send it.

Read the guide →
Strategy

Price to win: setting a bid you'll actually land

Use your own hit rate and margin history to find the price that maximizes expected profit, not the lowest and not the fattest.

Read the guide →
Field & Equipment

Steel erection costs: price the crane by picks, not tons

Crane duration runs on piece count, not tonnage or crew size. How to build the erection number from picks per day, with working rates.

Read the guide →
Data & Imports

DSTV / NC1 files: what they are and why estimators should use them

Every detailed job produces per-piece CNC files with exact profiles, holes, and copes. How to put them to work at the estimating desk.

Read the guide →
Finish

Galvanizing vs paint: estimating coating costs on steel

Galvanizing prices by the pound, paint by the square foot. Which members flip the answer, and the line items both quotes hide.

Read the guide →